We have commenced works for Hanwha Energy Corporation Ireland Limited on two energy storage projects in Co. Offaly.

The project scope includes the construction of two separate facilities, one at Lumcloon and one at Shannonbridge.

The BESS Facilities provide short term battery energy storage for surplus energy from the National Grid which is subsequently transferred back into the National Grid at Peak Energy Demand Periods.

Each site will contain a series of Battery Energy Storage System (BESS) units and control buildings, together with associated site works including Grid connection installation, access roadways, footpaths, paving, drainage and landscaping.