Commercial

Leeson Lane – Office Development

This landmark project  involved the construction of a modern 7-storey over-basement office building, seamlessly integrated with the careful refurbishment and redevelopment of the historic Spruce House, formerly a dispensary building. The two structures are linked at the rear of Spruce House, forming a cohesive and flexible multi-occupancy government headquarters.

Designed with sustainability and heritage preservation at its core, the development is fully compliant with the European Energy Performance of Buildings Directive and meets nZEB (nearly Zero Energy Building) standards. It incorporates advanced heat pump technology, predominantly renewable energy sources, and adheres to Green Procurement Policy—positioning it as a model for energy-efficient design.

This flagship development delivers a highly functional and future-focused workspace while respecting and celebrating the historic character of the site. It stands as a testament to our commitment to quality, sustainability, and thoughtful integration of modern infrastructure within a heritage context.

Client

Department of Tourism, Culture, Arts, Gaeltacht, Sports and Media / Department of Finance

Contract Duration

24 Months

Sector

Commercial

Area

6650m2

Architect

The Office of Public Works (OPW)

Civil / Structural Engineer

DBFL Consulting Engineers

Services Engineer

Cundall (Ireland) Ltd

Quantity Surveyor

Joseph C Hogan & Sons

Related Projects

CTA Block

Connect With Us

If you’d like to learn more about our expertise in a specific sector or gain insights into working with us, feel free to contact us, and we will respond as soon as possible.

Contact Us