Hotel/ Tourism/ Leisure

Alt Hotel Development

The ALT Hotel, formerly Andrews Lane Theatre involved the construction of 136 bedrooms, almost all of which are compact double-bedrooms of floor area c12.5m², spanning 9 floors including a single storey basement, a Lower Ground Floor Reception Area, and a Roof Top Plant Area.

The main structure of the building is in-situ with elements of Pre-cast and structural steel. The building envelope consists of brickwork and glazing facades.
A signature external stepped entrance and double height arrival space provides an exclusive entrance for the hotel, enhancing the exterior public space and creating more light along the street.

This interdisciplinary project is designed to be one of the first hotels in the capital to fulfil with the near zero energy building standards. It hosts air source heat pumps that will provide heating and cooling to all of the building. The hotel offers approximately 3,600m² of net floor space.

Contract Duration

17 Months

Contract Value

€18M

Client

Sector

Hotel/ Tourism/ Leisure

Architect

BDP

Civil / Structural Engineer

BDP

Services Engineer

BDP

Quantity Surveyor

Mitchell McDermott

Related Projects

CTA Block

Connect With Us

If you’d like to learn more about our expertise in a specific sector or gain insights into working with us, feel free to contact us, and we will respond as soon as possible.

Contact Us