
The National Archives Building
The redevelopment of the National Archives at Bishop Street, Dublin 8, involves the substantial removal...
Takeda Pharmaceutical Company Limited developed a state-of-the-art Biopharmaceutical Manufacturing Facility on a greenfield site in Piercetown, County Meath. The project comprised a central facility block, formed by three interconnected buildings, supported by a range of ancillary structures across the site.
The main campus included:
The new manufacturing building (Building 400) was designed to enable multi-product operations on a campaigned basis, with built-in flexibility to support future expansion and concurrent manufacturing operations—aligning with Takeda’s long-term strategic goals.
Duggan Brothers were responsible for the architectural fit-out of the 8,000 m² LAC Building (Building 300). The high-specification scope of works included:
This architectural fit-out was completed to the highest industry standards, ensuring operational functionality, regulatory compliance, and a modern, collaborative working environment. The result is a key part of a world-class manufacturing facility that supports Takeda’s global biopharmaceutical production network.
9 Months
€11.5M
Shire Pharmaceuticals
Industrial Pharmaceutical
Jacobs Engineering
Jacobs Engineering
Jacobs Engineering
Jacobs Engineering
If you’d like to learn more about our expertise in a specific sector or gain insights into working with us, feel free to contact us, and we will respond as soon as possible.