14 Months
€19M
Hanwha Energy Corporation
-
Malachy Walsh and Partners
Enerjec Ltd
Jennings O'Donovan Engineers
The project works comprise the construction of two seperate facilities, one at Lumcloon and one at Shannonbridge. The facilities will facilitate battery storage of energy from the electrical grid to provide a system reserve and to enable the supply of stored electrical energy back into the grid at the appropriate times to smooth power fluctuations. Each site will contain a series of battery storage units and control buildings, together with associated works including grid connection, installation, access roadways, footpaths, paving, drainage and landscaping.